Live project data
Answers and proposals use the current schedule, commitments, and controls — not a pasted export.
One connected platform for the master schedule, lookaheads, weekly commitments, and roadblocks so office and field teams finally plan the same project.
A project-aware Agent can cite live data and documents, prepare reviewable actions, and write only after human confirmation.
The connected project system
BuilderBridge links schedule logic, short-interval planning, weekly commitments, project controls, and portfolio visibility. Every team works from the same live project truth.
Riverside Apartments - Phase 1
Live project workspace
Master Schedule
5 activities · 1 critical path risk
Site prep & excavation
Jane GC
Jul 05 - Jul 10
Rough electrical wiring
Tom Electric
Jul 12 - Jul 20
Rough plumbing install
Sara Plumbing
Jul 16 - Jul 26
Electrical inspection
Tom Electric
Jul 21 - Jul 22
Drywall installation
Unassigned
Jul 27 - Aug 04
01
Dependencies, dates, critical path, and field updates move together.
02
Weekly promises produce PPC and variance signals automatically.
03
Project constraints roll into portfolio health without report chasing.
What sets BuilderBridge apart
Answers and proposals use the current schedule, commitments, and controls — not a pasted export.
When evidence comes from a file, the Agent shows the document, page, and excerpt.
Proposed RFIs, commitments, roadblocks, and schedule changes appear as cards with impacts and warnings.
Nothing is written until approval. Permissions and stale data are rechecked, then the activity log records it.
Review before write
The Agent never silently changes project records. Every operational write is cited where possible, reviewable as a proposal, and applied only after explicit confirmation.
01
A slip, roadblock, or open control item appears on the live plan.
02
Live tasks, commitments, and uploaded project documents are queried in context.
03
Sources show the file, page number, and excerpt when documents back the answer.
04
Changes, warnings, and expected impact are shown — still no write.
05
Explicit approval only. Permissions and stale snapshots are rechecked.
06
The schedule, RFI, or commitment updates atomically and lands in the activity log.
The operating rhythm
The master schedule should not disappear between updates. BuilderBridge turns it into a continuous loop between the office, the field, and the next decision.
Create activities, connect dependencies, protect milestones, and expose the critical path.
Contract schedule
Pull upcoming work into a rolling lookahead and sequence it with the people doing the work.
2-6 week lookahead
Capture trade commitments, completion, and reasons for variance while they are still actionable.
Weekly commitments
Feed actual progress, roadblocks, PPC, and schedule impact back into the next planning cycle.
Performance intelligence
Live project pulse
Composite health across schedule, PPC, variance, and roadblocks.
68%
Complete
75%
PPC
1
Open risk
-2d
Variance
Risk control
Roadblocks, RFIs, submittals, and schedule impact requests stay attached to the work they affect. Owners, due dates, and decisions are visible before risk becomes history.
One owner
for every constraint
One due date
for every decision
One activity
linked to every risk
One history
of every change
Project Controls
Linked risk register
1
Overdue
2
Due this week
1
Awaiting decision
Roadblock
Open
City permit approval
Rough plumbing install
Sara Plumbing
Today
RFI-024
Answered
Panel clearance confirmation
Electrical panel inspection
Design team
Jul 18
Submittal
Pending
Level 2 light fixtures
Rough electrical wiring
Tom Electric
Jul 20
Impact
Decision
Inspection shifted by 2 days
Close interior walls
Jane GC
Review
Built around the team
BuilderBridge keeps one connected data model underneath purpose-built workflows. Everyone sees what they need, and the project keeps one version of the truth.
Control the whole project without building another report.
Protect schedule logic while the project moves in real time.
Turn the contract plan into executable work for the field.
Commit, update, and raise issues without learning scheduling software.
Agent
The Agent reads live schedules, roadblocks, commitments, and project documents. It can prepare RFIs, commitments, and schedule updates as reviewable proposals — then stops until someone confirms.
BuilderBridge Agent
Harborview Residences — Building A
Action proposal
Pending confirmationRaise RFI — panel clearance
Confirm required working clearances at the main electrical panel before re-inspection. Linked to Electrical panel inspection.
Source
A000 NIST NZERTF Architectural Plans.pdf · page 1
“Confirm required working clearances at main distribution panel.”
No write yet. Confirm rechecks permissions and stale data, then logs the action.
Start with the next project
Create a connected project workspace, bring in the team, and turn the next schedule update into a shared operating plan.